Home
About Us
Contact Us
Products
News
Links
Resources
Technology for a cleaner environment
Customer Resources
Permissibility Checklist
Cooling Schematic
Installation Drawing
01. M130-015-01/MSHA Approval # 7F-015-0/MWM 916-6
schematic
drawing
02. M150—015-01/MSHA Approval #7F-021-0/Isuzu 6BG1
schematic
drawing
03. M168-001-01/MSHA Approval #7F-014-0/Cat 3306PCT
schematic
drawing
04. M251-001-01/MSHA Approval #36-SA050001/Cat 3306PCNA
schematic
drawing
05. M265-001-01/MWM 916-6 Wagner
schematic
drawing
06. M255-001-01/MSHA Approval #07-FA050001/Cummins 8.3
schematic
drawing
07. M268-001-01/MSHA Approval #36-SA050002/Cat 3304PCNA
schematic
drawing
08. M272-001-01/MWM 916-6 Eimco
schematic
drawing
09. M291-001-01/MSHA Approval #36-SA050003/Cat 3300 Intake
n/a
drawing
10. Water Injection System
schematic
n/a
Permissibility Checklist:
A permissibility checklist is a document of required weekly inspections that a mine operator must perform and sign off on for each piece of permissible diesel equipment that he is operating.
Water Injection System:
The water injection system is a DST
®
patented and unique system that allows for the on-board cleaning of the DST exhaust system, separating our product from the cumbersome manual and labor intensive cleaning systems offered by our competitors.
Home
About Us
Contact Us
Products
News
Links
Resources
Dry Systems Technologies
8102 Lemont Road, Suite 700
Woodridge, Illinois 60517
P (630) 427-2051
F (630) 427-1036
Dry Systems Technologies
1430 U.S. Hwy. 45 N
Vienna, Illinois 62995
P (618) 658-3000
F (618) 658-3002