Technology for a cleaner environment
 
Customer Resources

Permissibility Checklist Cooling Schematic Installation Drawing
01. M130-015-01/MSHA Approval # 7F-015-0/MWM 916-6 schematic drawing
02. M150—015-01/MSHA Approval #7F-021-0/Isuzu 6BG1 schematic drawing
03. M168-001-01/MSHA Approval #7F-014-0/Cat 3306PCT schematic drawing
04. M251-001-01/MSHA Approval #36-SA050001/Cat 3306PCNA schematic drawing
05. M265-001-01/MWM 916-6 Wagner schematic drawing
06. M255-001-01/MSHA Approval #07-FA050001/Cummins 8.3 schematic drawing
07. M268-001-01/MSHA Approval #36-SA050002/Cat 3304PCNA schematic drawing
08. M272-001-01/MWM 916-6 Eimco schematic drawing
09. M291-001-01/MSHA Approval #36-SA050003/Cat 3300 Intake n/a drawing
10. Water Injection System schematic n/a

Permissibility Checklist: A permissibility checklist is a document of required weekly inspections that a mine operator must perform and sign off on for each piece of permissible diesel equipment that he is operating.

Water Injection System: The water injection system is a DST® patented and unique system that allows for the on-board cleaning of the DST exhaust system, separating our product from the cumbersome manual and labor intensive cleaning systems offered by our competitors.
Dry Systems Technologies
8102 Lemont Road, Suite 700
Woodridge, Illinois 60517
P (630) 427-2051
F (630) 427-1036
Dry Systems Technologies
1430 U.S. Hwy. 45 N
Vienna, Illinois 62995
P (618) 658-3000
F (618) 658-3002